A salesman makes a 20 percent commission on the selling price of each set of encyclopedias he sells. If he sells 12 identical sets of encyclopedias and makes $1,800 in commissions ,what is the selling price of each set?
A. $300
B. $600
C. $750
D. $900
E. $1080
সঠিক উত্তরঃ
C.
$750
Explanation:

Related Questions (Any University/Year)
- If y% of x is 29. Then x =?
- ৬ + ৫ এর ১২=?
- In the first 10 overs of a cricket game,the run rate was only 3.2.what should be the run rate in the reamaining 40 overs to reach the target of 282 runs?
- If 12 men can build a wall 180 m long in 54 days ,how many days it will take to build a similar wall 160 m long ,if 16 men working on it
- In takes one machine 4 hours to complete a production order and another machine 3 hours to complete the same order. How many hours would it take when both machines complete the order simultaneowsly at their respective rates?
- A certain recipe calls for 3kgs of sugar for every 6 kgs of flour. If 60kgs of this sweet has to be prepared, how much sugar is required?
- Instructions: DO NOT USE CALCULATOR. Figures are not drawn to scale. Arif can do a work in 12 hours. Arif finished two-thirds of the work and the remaining portion of the work was done by Babu, whose rate of working is just 20% of what Arif can do. How long did it take Babu to finish the remaining work in hours?
- The electric company charge: Tk 0.3 per KWH. Rahim used 2800 KWH in April, 3200 KWH in May, and 3600 KWH in June. What was his average costs of electricity in taka for the 3 months?
- The difference of the squares of two consecutive odd numbers is 84. What is the sum of the two numbers?
- n denotes the number obtained when n is rounded to the nearest tenth. For example 4.31=4.3 0.089-1.135=
- If a, b and c are 3 consecutive integers in that order, which of the following has the lowest value?
- A can complete a project in 20 days and B can complete the same project in 30 days. If A and B start working on the project together and A quits 10 days before the project is completed, in how many days will the project be completed?
- Sally gets paid x dollars per hour for a 40-hour work week and y dollars for each hour she works over 40 hours. How much did Sally earn if she worked 48 hours?
- A can complete a work in 15 days and B can complete the work in 20 days. If B works for 8 days and left the job, then in how many days the A can complete the remaining job?
- Out of a total of 1,000 employees at a certain corporation, 52 percent are female and 40 percent of these females work in research. If 80 percent of the total number of employees work in research, how many male employees do NOT work in research?
- Working independently, Sourodip can perform a certain task in 6 hours and Eshanee can perform it in 7 hours. If Sourodip and Eshanee work together for 3 hours, and then Sourodip leaves, how many hours will it take Eshanee to complete the task alone?
- যদি y(x-1)=z হয়, তবে x=?
- Amio working alone ,can finish a certain job in 10 days and Sumio working alone can finish the same job in 15 days. If Amio and Somio are working together how many days do they need to finish the job?
- Instructions: DO NOT USE CALCULATOR. Figures are not drawn to scale. Arif has x marbles of which 20% are black and 80% are red. Babu has y marbles of which 40% are black and 60% are green. Dipu has z marbles of which 50% are black and 50% are blue. If 25% of the total marbles they have are black, what is x?
- 15 workers can finish a job in 12 days. They work for 4 days, after which 5 additional workers join the team. In how many days will all of them together complete the remaining job?