A and B together can complete a piece of work in 72 days, B and C together in 120 days and A and C together in 90 days. A, B and C together can complete the work in?
A. 35 days
B. 40 days
C. 48 days
D. 60 days
E. 50 days
সঠিক উত্তরঃ
D.
60 days
Explanation:

Related Questions (Any University/Year)
- The sum of the squares of the two consecutive integers is 145. The sum of the positive integers is:
- Three workers can do a job in 12 days . Two of the workers work twice as fast as the third . How long would it take one of the fastest workers to do the job alone?
- If y% of x is 29. Then x =?
- A 112 meter rope is cut into three pieces with each piece twice as long as the previous one. How long is the longest piece?
- ০.২২×০.৭০= ?
- Which Number Should come next in this series? 25,24.22.19,15
- আয়তক্ষেত্রের বাহুগুলােকে 20% বর্ধিত করলে এর ক্ষেত্রফল কত শতাংশ বৃদ্ধি পাবে?
- Which one of the following is greater than 2/3?
- In the figure, AC=AD, and CD = BD = AB. What is the value of <CAD?
- If 12 men can reap 120 acres of land in 36 days, how many acres of land can 54 men reap in 54 days?
- কাফি ও খলিল একটি কাজ যথাক্রমে ১০ দিনে ও ১৫ দিনে করতে পা??ে। তারা একত্রে কাজটি কত দিনে করতে পারবে?
- The average weight of 8 persons increases by 2.5 kg when a new person comes in place of one of them weighing 65 kg. What might be the weight of the new person?
- Machine A can produce 40 bolts per minute, whereas machine B can produce only 30 per minute. Machine A begans along to make bolts but it breakdown after 1.5 minute and machine B must complete the job . If the job requires 300 bolts, how long does the whole operation take?
- তিনটি মেশিন একটি কাজ যথাক্রমে ৪, ৫, ৬ ঘণ্টায় করতে পারে। দুইটি মেশিন সর্বোচ্চ ক্ষমতায় কাজ করে এক ঘণ্টায় কতটুকু কাজ করতে পারে?
- Instructions: DO NOT USE CALCULATOR. Figures are not drawn to scale. In a particular course, Arif appeared in 10 quizzes. The average of his best 9 quizzes is 10% more than the average of all the quizzes he attended. The total marks obtained in best 9 quizzes is what percent of the total marks obtained in 10 courses?
- Ajar contains 10 red marbles and 30 green ones. How many red marbles must be added to the jar so that 60% of the marbles will be red?
- Rima bought four books that cost Tk. 6.00 each and two books that cost Tk. 3.00 each. What is the average cost of the six books?
- Two workers, working separately but at the same speed, take hours 40 minutes to complete a particular task, How long will one of these two workers take to complete the same task alone?
- 50 জন ছাত্রের একটি শ্রেনিতে রূপমের স্থান হচ্ছে শীর্ষ থেকে অষ্টম এবং হাসিবের স্থান হচ্ছে নিচ থেকে বিমতম। তাহলে রূপম ও হাসিবের মাঝে কতজন ছাত্র আছে?
- Ajar contains 10 red marbles and 30 green ones .How many red marbles must be added to the jar so that 60% of the marbles will be red?